Proof of completion: photos and certificates that show the work is done

Proof of completion is the evidence that maintenance work was done to your standard: before-and-after photos, signed checklists, test results, certificates or a check-in at the site. Operators need it for landlords, franchise brands, insurers and regulators. Contractors need a simple way to provide it.

In OpsChase, you set proof requirements per template or trade, and a job can’t be marked complete until they are met.

Why multi-site teams care about proof

At one site, you can walk over and look. Across a portfolio, the work order is the only view you get. Without proof, “done” means “the contractor said so”, and you find out otherwise when a customer, auditor or insurer does. Good proof also saves money: it settles invoice questions, shows warranty work was done, and tells the next technician what was found.

What good proof looks like

  • Requirements set by trade and job type, so a fire service visit asks for different evidence than a door repair.
  • Before-and-after photos that show the actual fault and the fix, taken at the site.
  • Test results or certificates where the trade produces them, attached to the job.
  • A clear note of what was found and anything still outstanding.
  • Everything on the work order, not spread across texts and email attachments.

Common proof mistakes

  • Asking for “photos” without saying what they should show.
  • Letting contractors upload proof days later, in one batch, for several sites at once.
  • Treating an invoice as proof that the work happened.
  • Asking for so much evidence on small jobs that contractors stop taking them.
  • Storing proof where only one person can find it.

How proof fits jobs tracked until the work is done

In OpsChase, proof requirements are set when you build job templates. Contractors upload from their phone, and your team is notified when the requirements are met. If proof is missing, tracking keeps going until it arrives, and the job cannot be closed until every required item is in. When a landlord or franchise reviewer asks, you can export the work order history with the evidence attached.

Where to start

Pick the five job types you raise most often and write one line for each: what the photos must show, and which certificate or test result is needed. Share it with your contractors before you turn the requirements on. Firms find it much easier to send the right proof once they know exactly what you want.

On OpsChase: one queue for your team and contractors, each job tracked until the work is done, then photos or sign-off. Book a demo — one site or many.

Can proof requirements differ by site?
Yes. Templates and site details combine to set what is needed.
Is a site check-in required?
Only if you turn it on for a template or site.
Where are files stored?
On the work order. Only people on that job get a secure link.
What if the contractor can’t take photos, for example in a secure area?
Set a different requirement for that site, such as a signed checklist or a supervisor’s confirmation.
Does asking for proof slow contractors down?
Not when the requirements are clear. Most delay comes from guessing what the customer wants; a clear list removes the guesswork.
Is a contractor’s service report enough proof?
Sometimes. A report written on site, with photos and readings, can be good evidence. A summary sent weeks later for several sites is not. Ask for proof on each work order, taken at the visit, so it matches the job it belongs to.