Picture the power going out across your area one evening. Two of your sites are dark, one is running on a generator, and a fourth comes back an hour later with the alarm panel beeping and the cool room warming up. By morning, every site manager has a different list of what isn’t working, and nobody is sure what was checked overnight.
Outages after storms, heatwaves and network faults are part of running sites in Australia. You can’t control when the power goes, but you can decide in advance who checks each site, what gets restarted in what order, and how every fault left behind gets fixed.
This checklist is for operators running more than one site. It isn’t electrical advice. Treat every fallen powerline as live, keep well clear, and call your energy distributor or emergency services. Any work on switchboards or wiring is for a licensed electrician.
While the power is out: who checks which site
Decide this now, for each site, before the next outage:
1. Who checks the site, and how soon. For a site that is closed overnight or over a weekend, name the person who drives past or opens up. 2. Cold stock. Keep fridge and cool room doors shut. Know how long stock can safely sit, who reads and writes down the temperature, and when stock gets moved or thrown out. 3. Security. Alarms and cameras may run on batteries for a while and then stop. Know who checks that the site is locked and secure. 4. Water. Sump pumps and pump-out pits stop without power. On a wet night, someone needs to check for rising water. 5. Gates and roller doors. Know how each one opens on manual, and keep the release key or handle where staff can find it. 6. Standby power. If a site has a generator, check it started, keep an eye on the fuel, and know who refuels it. Run portable generators outdoors, away from doors and windows, and never plug one into the switchboard or a power point. Connecting a generator to the building is work for a licensed electrician.
Keep this list for every site, with after-hours numbers for your electrical, refrigeration and generator contractors, where on-call staff can find it.
When the power comes back: restart in stages
Turning everything back on at once can trip the supply again. Bring each site back in stages:
- Switchboard and safety switches. If breakers or safety switches have tripped and won’t reset, stop and call an electrician. Don’t keep resetting them.
- Fire panel and alarms. Check the fire panel for faults and get your fire protection contractor to clear anything it shows. Re-arm the security system and check every camera is recording again with your security contractor.
- Lifts. If a lift stopped mid-floor or shows a fault, keep it out of use until your lift contractor has checked it.
- Heating and cooling. Give heating and cooling units time to settle before restarting, and book a check for any unit that won’t start or keeps tripping.
- Cool rooms and fridges. Confirm they are back in range before restocking, and write down the temperatures and times.
- Tills, network and phones. Check point-of-sale terminals, internet and phone lines come back, and that the building controls are running their normal schedule.
- Emergency and exit lighting. Their batteries may have run flat. Check they are recharging, and book a test if any light stays off.
- Generator. Refuel it, and book a service if it ran for a long time.
After the outage: one job per fault, per site
An outage can leave a list of faults at each site. Write them down as jobs, not phone calls:
- Raise every fault at each site, with photos, as soon as it is found: the tripped board, the cool room that won’t hold temperature, the camera that won’t come back.
- Fix what matters most first, such as cold stock, fire and security systems, and anything that stops the site opening.
- Keep temperature logs, photos and contractor reports with each job. If you claim for lost stock, your insurer may ask for them, and it’s easier when they sit with the job instead of on someone’s phone.
If the outage came with a storm, our storm season checklist covers the make-safe work as well. Hail damage often shows up weeks later; our hail damage checklist covers roofs, solar and rooftop plant.
Running outage faults on one OpsChase board
OpsChase is one AI-powered platform for running maintenance across one site or many. When the power comes back, every site’s faults land in one place:
- Anyone can raise a fault from their phone, with photos, whether it’s a site manager, the person on call or the staff member opening up.
- Jobs are booked to your own team or your contractors. Set your regular contractors per site and per trade, such as the electrician, the refrigeration mechanic and the generator service firm for each site, so each job goes to the right regular contractor.
- Each site’s faults are sorted by priority and due date, and head office sees every site on one board, so a cool room full of stock isn’t waiting behind a flickering car park light.
- Each job is tracked until the work is done, then closed with proof of completion: photos and sign-off on the work order.
- Keep licence, public liability, induction and site-access details on file for each contractor firm through contractor compliance, so the team can check them before booking anyone onto a switchboard.
With assets and planned maintenance switched on, generator servicing, emergency lighting tests, fire panel checks and cool room servicing become planned maintenance on scheduling, booked at every site before the next outage. Each generator, cool room and switchboard keeps its own service history, so you can see what was serviced and when.
What the manager sees
Across every site, the manager sees one board:
- Every outage fault, by site, sorted by priority and due date.
- Who is booked to attend each job, with photos and contractor notes.
- Which sites are fully running again and which still have open jobs.
- Late jobs showing against your response targets.
For more on running several sites from one view, see multi-site maintenance and facilities maintenance.
Where to start
This week, write down who checks each site in an outage, how each gate and roller door opens on manual, and the after-hours number for each site’s electrician and refrigeration contractor. Book any generator servicing and emergency lighting tests that are due. Then see how OpsChase handles it on pricing, or book a demo with a list of your sites.
When the next outage comes, every site knows what to check, and every fault it leaves behind is on one board.
